Construction study of the Palace of the Children of Don Gome (Andújar, Jaén), managed through the HBIM project

[EN] Building Information Modelling (BIM) is a collaborative system used extensively in the design and management of the Architecture, Engineering and Construction (AEC) industries. Current platforms manage the information as data centres (i.e. databases) related to graphical representations located...

Full description

Bibliographic Details
Authors: Nieto, Enrique; Moyano, Juan José; García, Álvaro
Format: Article
Publication date:2019
Country:España
Institution:Universitat Politècnica de València (UPV)
Repository:RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Language:Spanish
OAI Identifier:oai:riunet.upv.es:10251/116465
Online Access:https://riunet.upv.es/handle/10251/116465
Access Level:Open access
Keyword:Proyecto HBIM (Modelado Histórico de Información para la Construcción)
Modelo de información patrimonial
Fotogrametría
Arqueología de la arquitectura
BIM
HBIM (Historic Building Information Modelling) Project
Heritage information model
Photogrammetry
Archaeology of architecture
_version_ 1878731967126568960
author Nieto, Enrique
author2 Moyano, Juan José
García, Álvaro
author2_role author
author
author_browse García, Álvaro
Moyano, Juan José
Nieto, Enrique
author_facet Nieto, Enrique
Moyano, Juan José
García, Álvaro
author_role author
collection RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
description [EN] Building Information Modelling (BIM) is a collaborative system used extensively in the design and management of the Architecture, Engineering and Construction (AEC) industries. Current platforms manage the information as data centres (i.e. databases) related to graphical representations located in 3D parametric models. Today, these new technologies are nowadays being incorporated in heritage assets. This paper aims to establish a methodology, based on these efficient platforms, for studying built heritage, including historical and construction aspects by adding the chronology of those interventions made in the historic building. This case study is focused on the Palace of the Children of Don Gome, a historic building located in the city of Andújar, in Jaén (Spain). The interest of this case study lies in the historic innovations and areas added to this palace. Likewise, the collection and manipulation of the graphic information and data related to the interventions have been based on an interoperable 3D graphic model, which allows users to include all the related documentation from different disciplines associated with the conservation and heritage restoration processes. In this paper, the construction process carried out during the last restoration of the building is studied. Specifically, it analyses the last building intervention in 1989, in particular an area of the coffered ceiling slab in the northern nave, located on the first floor. Within this model, all the elements that constitute the roof of the tower, mudwall walls, slabs and coffered ceilings of the northern nave have been studied, using photogrammetry for data acquisition and 3D modelling, and these data are included in a 3D digital model of the building generated using ArchiCAD software. Moreover, the system will be used to improve the management of the information obtained during heritage maintenance, creating a record of the whole building life cycle. As well as the historical documentation and graphical research, and the analysis of the procedures carried out during the last refurbishment of the building, new building construction system proposals have arisen which have been modelled to fulfil the Level Of Development (LOD) 300. Further analysis of these construction solutions used provides knowledge of how large 16th century palaces were built, and the kind of restoration conducted by architects at the end of the 20th century. The results obtained show how current BIM platforms are able to record construction and evolutionary aspects of a building’s history, by identifying all the original elements and classifying them before their demolition. Also, by making a detailed inventory of the whole coffered ceiling in which the position and the temporal order (original – later addition) of the elements are included, it is possible to virtually replace those elements in their original positions, reducing the visual impact of the intervention. On the other hand, multiple errors in projects based on graphical systems of representation, mainly Computer-Aided Design (CAD), may derive from contradictions in the official sources consulted, such as the plans of the cadastre, the city council, and those produced through manual measurement procedures. However, in this paper, real graphical documentation has been generated using specific 3D surveying techniques for capturing geometry and accurate measurements, as well as by utilising the BIM system.
eu_rights_str_mv openAccess
format article
id ES_3a3a90dfd68f7acb4e28681bc14f51af
institution Universitat Politècnica de València (UPV)
instname_str Universitat Politècnica de València (UPV)
language spa
network_acronym_str ES
network_name_str España
oai_identifier_str oai:riunet.upv.es:10251/116465
publishDate 2019
publishDateSort 2019
publisher Universitat Politècnica de València
publisherStr Universitat Politècnica de València
reponame_str RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
spelling Construction study of the Palace of the Children of Don Gome (Andújar, Jaén), managed through the HBIM project Estudio constructivo del Palacio de los Niños de Don Gome (Andújar, Jaén), gestionado desde el proyecto HBIM Nieto, Enrique Moyano, Juan José García, Álvaro Proyecto HBIM (Modelado Histórico de Información para la Construcción) Modelo de información patrimonial Fotogrametría Arqueología de la arquitectura BIM HBIM (Historic Building Information Modelling) Project Heritage information model Photogrammetry Archaeology of architecture [EN] Building Information Modelling (BIM) is a collaborative system used extensively in the design and management of the Architecture, Engineering and Construction (AEC) industries. Current platforms manage the information as data centres (i.e. databases) related to graphical representations located in 3D parametric models. Today, these new technologies are nowadays being incorporated in heritage assets. This paper aims to establish a methodology, based on these efficient platforms, for studying built heritage, including historical and construction aspects by adding the chronology of those interventions made in the historic building. This case study is focused on the Palace of the Children of Don Gome, a historic building located in the city of Andújar, in Jaén (Spain). The interest of this case study lies in the historic innovations and areas added to this palace. Likewise, the collection and manipulation of the graphic information and data related to the interventions have been based on an interoperable 3D graphic model, which allows users to include all the related documentation from different disciplines associated with the conservation and heritage restoration processes. In this paper, the construction process carried out during the last restoration of the building is studied. Specifically, it analyses the last building intervention in 1989, in particular an area of the coffered ceiling slab in the northern nave, located on the first floor. Within this model, all the elements that constitute the roof of the tower, mudwall walls, slabs and coffered ceilings of the northern nave have been studied, using photogrammetry for data acquisition and 3D modelling, and these data are included in a 3D digital model of the building generated using ArchiCAD software. Moreover, the system will be used to improve the management of the information obtained during heritage maintenance, creating a record of the whole building life cycle. As well as the historical documentation and graphical research, and the analysis of the procedures carried out during the last refurbishment of the building, new building construction system proposals have arisen which have been modelled to fulfil the Level Of Development (LOD) 300. Further analysis of these construction solutions used provides knowledge of how large 16th century palaces were built, and the kind of restoration conducted by architects at the end of the 20th century. The results obtained show how current BIM platforms are able to record construction and evolutionary aspects of a building’s history, by identifying all the original elements and classifying them before their demolition. Also, by making a detailed inventory of the whole coffered ceiling in which the position and the temporal order (original – later addition) of the elements are included, it is possible to virtually replace those elements in their original positions, reducing the visual impact of the intervention. On the other hand, multiple errors in projects based on graphical systems of representation, mainly Computer-Aided Design (CAD), may derive from contradictions in the official sources consulted, such as the plans of the cadastre, the city council, and those produced through manual measurement procedures. However, in this paper, real graphical documentation has been generated using specific 3D surveying techniques for capturing geometry and accurate measurements, as well as by utilising the BIM system. [ES] El presente documento pretende exponer una metodología eficiente para el estudio del patrimonio construido que englobe aspectos históricos y constructivos al incorporar la cronología de las intervenciones realizadas en el edificio histórico. El caso de estudio se centra en el Palacio de los niños de Don Gome, un edificio histórico situado en la localidad de Andújar, en Jaén (España). La recopilación y manipulación de la información gráfica y de datos relacionados se sustentará en un modelo gráfico 3D interoperable, que permita una gestión de toda la documentación integrada en el mismo desde todos los campos disciplinares relacionados con el proceso de conservación y rehabilitación patrimonial. Además, el sistema permitirá ampliar la gestión de la información que se obtiene en el mantenimiento del patrimonio, cumpliendo así su ciclo de vida. En el trabajo expuesto se analiza el proceso constructivo llevado a cabo en la última rehabilitación del edificio. En concreto, se analiza la fase realizada en la última intervención del edificio en el año 1989 y en una zona puntual del artesonado del forjado de la Nave Norte, situada en la primera planta. Estos datos se incluyen en un modelo digital 3D de información del edificio generado mediante el software ArchiCAD. Dentro del propio modelo se han estudiado en profundidad todos los elementos que conforman la cubierta de la torre, los muros de tapial, forjados, cubiertas y artesonados de la nave norte, empleando en esta última zona la fotogrametría como técnica de adquisición de datos y reproducción en 3D. Se lleva a cabo una clasificación tipológica de los elementos singulares de los canes originales del siglo XVI en el modelo 3D y se implanta un nuevo procedimiento de marcadores de revisión que identifican tanto las omisiones del proyecto como las intervenciones a lo largo de la historia del edificio patrimonial en el Proyecto HBIM. Lo más destacado: Estudio constructivo mediante tecnología BIM que desarrolla la clasificación tipológica de los elementos singularede valor histórico en el patrimonio arquitectónico. Registro, organización de datos y marcadores de revisión que identifican las fases de intervención en el ProyectHBIM. Análisis del proceso constructivo de la rehabilitación de 1989 del Palacio de los niños de Don Gome en Andújar bajo un enfoque BIM. Universitat Politècnica de València https://riunet.upv.es/handle/10251/116465
spellingShingle Construction study of the Palace of the Children of Don Gome (Andújar, Jaén), managed through the HBIM project
Nieto, Enrique
Proyecto HBIM (Modelado Histórico de Información para la Construcción)
Modelo de información patrimonial
Fotogrametría
Arqueología de la arquitectura
BIM
HBIM (Historic Building Information Modelling) Project
Heritage information model
Photogrammetry
Archaeology of architecture
title Construction study of the Palace of the Children of Don Gome (Andújar, Jaén), managed through the HBIM project
title_full Construction study of the Palace of the Children of Don Gome (Andújar, Jaén), managed through the HBIM project
title_fullStr Construction study of the Palace of the Children of Don Gome (Andújar, Jaén), managed through the HBIM project
title_full_unstemmed Construction study of the Palace of the Children of Don Gome (Andújar, Jaén), managed through the HBIM project
title_short Construction study of the Palace of the Children of Don Gome (Andújar, Jaén), managed through the HBIM project
title_sort Construction study of the Palace of the Children of Don Gome (Andújar, Jaén), managed through the HBIM project
topic Proyecto HBIM (Modelado Histórico de Información para la Construcción)
Modelo de información patrimonial
Fotogrametría
Arqueología de la arquitectura
BIM
HBIM (Historic Building Information Modelling) Project
Heritage information model
Photogrammetry
Archaeology of architecture
topic_facet Proyecto HBIM (Modelado Histórico de Información para la Construcción)
Modelo de información patrimonial
Fotogrametría
Arqueología de la arquitectura
BIM
HBIM (Historic Building Information Modelling) Project
Heritage information model
Photogrammetry
Archaeology of architecture
url https://riunet.upv.es/handle/10251/116465