A New Constructive Heuristic for the Fm|block|ST

This paper deals with the blocking flow shop problem and proposes new constructive procedures for the total tardiness minimization of jobs. The heuristic has three-phases to build the sequence; the first phase selects the first job to be scheduled, the second phase arranges the remaining jobs and th...

Full description

Bibliographic Details
Authors: Companys Pascual, Ramón; Ribas Vila, Immaculada|||0000-0002-3701-118X
Format: Book chapter
Publication date:2014
Country:España
Institution:Universitat Politècnica de Catalunya (UPC)
Repository:UPCommons. Portal del coneixement obert de la UPC
Language:English
OAI Identifier:oai:upcommons.upc.edu:2117/24832
Online Access:https://hdl.handle.net/2117/24832
Access Level:Open access
Keyword:Heuristic algorithms
flow shop
blocking
tardiness
Heurística
Àrees temàtiques de la UPC::Economia i organització d'empreses
Description
Summary:This paper deals with the blocking flow shop problem and proposes new constructive procedures for the total tardiness minimization of jobs. The heuristic has three-phases to build the sequence; the first phase selects the first job to be scheduled, the second phase arranges the remaining jobs and the third phase uses the insertion procedure of NEH to improve the sequence. The proposed procedures evaluate the tardiness associated to the sequence obtained before and after the third phase in order to keep the best of both because the insertion phase can worsen the result. The computational evaluation of these procedures against the benchmark constructive procedures from the literature reveals their good performance.