Bimaxillary simultaneous immediate loading of full-arch restorations: A case series

Aim: To describe a bimaxillary simultaneous immediate loading protocol with full-arch implant-supported fixed prostheses. Material and Methods: A prospective case series of 8 patients who required full-arch rehabilitation was conducted. The main inclusion criteria were patients with teeth that requi...

Full description

Bibliographic Details
Authors: Cercadillo-Ibarguren, Iñaki; Sánchez Torres, Alba; Barbosa de Figueiredo, Rui Pedro; Valmaseda Castellón, Eduardo
Format: Article
Status:Published version
Publication date:2017
Country:España
Institution:Universidad de Barcelona
Repository:Dipòsit Digital de la UB
OAI Identifier:oai:diposit.ub.edu:2445/125629
Online Access:https://hdl.handle.net/2445/125629
Access Level:Open access
Keyword:Maxil·lars
Pròtesis dentals
Restauració dental
Jaws
Dental prosthesis
Dental Restoration
Description
Summary:Aim: To describe a bimaxillary simultaneous immediate loading protocol with full-arch implant-supported fixed prostheses. Material and Methods: A prospective case series of 8 patients who required full-arch rehabilitation was conducted. The main inclusion criteria were patients with teeth that required extraction. At least 1 molar per arch was temporarily employed to stabilize the surgical template and the provisional prosthesis during intraoral relining. Results: Two upper implants failed in 1 patient. Structural fracture was registered in 3 patients, around 3 months after loading. All of them had bruxism. Three esthetic complications were registered: midline deviation,canting of the oclusal plane and color mismatch. Conclusions: Although this protocol achieves optimal results, some mechanical complications were encountered. The fracture of the provisional prosthesis is a relatively common mechanical complication but does not seem to jeopardize the final treatment result.